The BICSI OSP-002 exam is a valuable certification program for individuals who wish to become professional outside plant designers. The exam covers a wide range of OSP design topics and is designed to assess a candidate's knowledge and skills in these areas. Passing the exam and obtaining the BICSI OSP certification can lead to increased career opportunities and earning potential in the OSP design industry.
NEW QUESTION # 59
What kinds of connection to the cable does a UTP jack typically have?
- A. 110 punchdown
- B. Solder connections
- C. 66 punchdown
- D. Snap-in contacts
Answer: A
NEW QUESTION # 60
IEEE 802.11b has a range of \_\_\_ feet.
- A. 0
- B. 1
- C. 2
- D. 3
Answer: D
NEW QUESTION # 61
Concatenation or the joining of two cables in a long outside plant run is almost always done by
\_\_\_\_\_\_\_\_\_\_.
- A. Splicing on pigtailled connectors
- B. Fusion splicing
- C. Mechanical splicing
- D. Field installation of connectors
Answer: B
NEW QUESTION # 62
\_\_\_\_\_\_\_ companies overbuild with fiber, often lashing fiber optic cables to installed aerial coax cable.
- A. Independent telephone
- B. Utilities
- C. CATV
- D. Private network
Answer: A
NEW QUESTION # 63
Wireless access points can use \_\_\_\_\_ to simplify powering the equipment.
- A. Power over Ethernet (IEEE 802.3ah)
- B. Low voltage power supplies
- C. Data signal power
- D. AC
Answer: A
NEW QUESTION # 64
A wireless antenna is also known as a \_\_\_\_\_\_\_\_\_\_.
- A. Wireless router
- B. Hot spot
- C. WC (wireless cell)
- D. Access point
Answer: D
NEW QUESTION # 65
Cable plant loss should be estimated during the \_\_\_\_\_\_ phase.
- A. Troubleshooting
- B. Installation
- C. Design
- D. Testing
Answer: C
NEW QUESTION # 66
From a reliability standpoint, \_\_\_\_\_\_\_\_\_\_\_\_ is the best method to join two fibers.
- A. Factory terminations
- B. Fusion splicing
- C. Mechanical splicing
- D. Adhesive/polish connectors
Answer: B
NEW QUESTION # 67
Prior to cable plant acceptance or system turn-up, standards require that a(n) _______ is used to test the cable plant to ensure it is within the loss budget.
- A. Power meter
- B. OTDR
- C. All of the above
- D. LSPM or OLTS (Light source and power meter, optical loss test set)
Answer: D
NEW QUESTION # 68
UTP cable is designed to be pulled with no more than \_\_\_\_\_ pounds tension.
- A. 0
- B. 1
- C. 2
- D. 3
Answer: C
NEW QUESTION # 69
What cable types are included in the TIA-568 structured cabling standards?
- A. UTP (unshielded twisted pair), ScTP (screened twisted pair), STP (shielded twisted pair) and fiber optics
- B. UTP (unshielded twisted pair), STP (shielded twisted pair) and coax
- C. UTP (unshielded twisted pair), ScTP (screened twisted pair) and STP (shielded twisted pair)
- D. UTP (unshielded twisted pair) and coax
Answer: A
NEW QUESTION # 70
Wireless networks require cables to connect the server, router or hub to the \_\_\_\_\_\_.
- A. AP (Access point)
- B. Uplink
- C. SNMP
- D. PC
Answer: A
NEW QUESTION # 71
Hardware like video cameras designed to run on coax can be used on UTP with a converter device called a
\_\_\_\_\_\_\_\_\_.
- A. Splitter
- B. TOSLINK
- C. Balun
- D. Adapter
Answer: C
NEW QUESTION # 72
The Cat 3 jack is the same as a Cat 5e/6 jack except _________.
- A. There are no internal twists to enhance performance
- B. It is keyed to snap into outlets upside down
- C. It only connects to RJ-45 plugs
- D. The punchdowns fit bigger wires
Answer: A
NEW QUESTION # 73
Ethernet was first developed as a \_\_\_\_ architecture using \_\_\_\_\_ cable with \_\_\_\_\_\_\_.
- A. Bus, coax, taps
- B. Star, UTP, RJ-45 connectors
- C. Ring, coax, RJ-45 connectors
- D. Bus, UTP, RJ-45 connectors
Answer: D
NEW QUESTION # 74
When terminating Cat 5e/6, what must be remembered to maintain the performance of the installed cable?
- A. The jacket of the cable must not be stripped back more than 3 inches
- B. Keep the pairs twisted to within 1/2 inch of the termination
- C. The punchdown tool must cut off the wires close to the end
- D. Do not strip insulation off the wires
Answer: B