SAP C_TS422_2021 exam consists of 80 multiple-choice questions and has a time limit of 180 minutes. C-TS422-2021 exam is available in English and is offered through the SAP Certification Hub. Candidates must score a minimum of 64% to pass the exam and earn the SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification.
NEW QUESTION # 40
Where do you maintain data to determine the duration of an operation for production?
- A. Bill of material (BOM)
- B. Work center
- C. Routing
- D. Material master
Answer: B,C
NEW QUESTION # 41
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.
- A. Scheduling control
- B. Direction
- C. Planning mode
- D. Fixed pegging
- E. Finiteness level
Answer: A,B,C
NEW QUESTION # 42
Which business processes are affected by setting in the order type-dependent parameters?
- A. Implement engineering changes.
- B. Intiate quality inspections.
- C. Define integration to cost accounting.
- D. Select master data.
Answer: C,D
NEW QUESTION # 43
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
- A. By usage probability
- B. 100% check
- C. First in first out (FIFO)
- D. Simultaneous
Answer: A,B
NEW QUESTION # 44
What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order's components are copied to the picking list.
- B. The planed order's component availability is checked.
- C. The planed order is converted to production order.
- D. The planed order generates capacity requirements
Answer: D
NEW QUESTION # 45
What type of time element can be reduced by strategy settings while dispatching?
- A. Queue time
- B. Transportation time
- C. Wait time
- D. Setup time
Answer: A,C
NEW QUESTION # 46
Which item statuses can you select inside a material BOM?
- A. Service
- B. Sales
- C. Quality management
- D. Engineering
Answer: B,D
NEW QUESTION # 47
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?
- A. The most restrictive status
- B. The cross-plant status
- C. The last restrictive status
- D. The plant-specific status
Answer: A
NEW QUESTION # 48
How would you define pegging in the context of Advanced Planning?
- A. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
- B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements
- C. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.
- D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
Answer: D
NEW QUESTION # 49
Which of the following questions do you have to answer before you start creating a BOM?
- A. Which Valid To information is necessary?
- B. Is the material type allowed in the BOM?
- C. In which storage location is the BOM required?
- D. What status does the BOM have?
Answer: A,B
NEW QUESTION # 50
Which chart types does the tabular planning table provide in SAP S/4HANA
- A. Order (dispatched) chart
- B. Work center capacities chart
- C. Capacity requirements chart
- D. Order (pool) chart
Answer: B,C
NEW QUESTION # 51
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?
- A. Create object selection variant for product-related alerts.
- B. Assign the alert profile to the overall profile.
- C. Create object selection variant for transportation lane-related alerts.
- D. Assign the overall profile to the authorization profile.
Answer: A,B
NEW QUESTION # 52
Which materials have a negative quantity in a bill of materials or in a recipe?
- A. Waste products
- B. By-products
- C. Co-products
- D. Continuous flow materials
- E. Bulk materials
Answer: B,C,D
NEW QUESTION # 53
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Make-to-order production (20)
- B. Planning at assembly level (70)
- C. Planning with final assembly (40)
- D. Planning without final assembly (50)
Answer: D
NEW QUESTION # 54
Which of the following elements does MRP take into account during net requirement calculation?
- A. Maximum stock level
- B. Safety stock
- C. Lot size
- D. Purchase orders
Answer: B,C
NEW QUESTION # 55
Which of the following is valid sequence of the main activities in production order processing?
- A. Creation, printing, release, goods issue, confirmation, goods receipt
- B. Creation, release, printing, goods issue, confirmation, goods receipt
- C. Creation, release, settlement, goods issue, confirmation, goods receipt
- D. Creation, availability check, release, material widrawal, confirmation
Answer: B,D
NEW QUESTION # 56
What does a line hierarchy in repetitive manufacturing represent?
- A. A production line with more than one work center
- B. A production line with an alternative sequence in the routing
- C. A production line with prioritized alternative work centers
- D. A production line with a parallel sequence in the routing
Answer: A
NEW QUESTION # 57
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. WBS item
- B. Variable-size item
- C. Non-stock item
- D. Work item
Answer: B,C
NEW QUESTION # 58
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?
- A. Use the batch information cockpit.
- B. Use the material staging report.
- C. Use batch determination.
- D. Use the material where-used report.
Answer: A
NEW QUESTION # 59
Which information is required when you created a production master in SAP S/4HANA?
- A. Selective screen for views
- B. Base unit of measure
- C. Industry sector
- D. Product type
Answer: A,D
NEW QUESTION # 60
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
- A. SAP Fieldglass
- B. SAP Hybris
- C. SAP Concur
- D. SAP SuccessFactors
- E. SAP Ariba
Answer: A,C,E
NEW QUESTION # 61
You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible. Which setting do you make to achive this?
- A. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed MRP indicator
- B. Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective indicator
- C. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Invidual/collective indicator
- D. Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator
Answer: C
NEW QUESTION # 62
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?
- A. MRP controller
- B. MRP planning file
- C. MRP group
- D. MRP type
Answer: A
NEW QUESTION # 63
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A. Fill up to the safety stoc level
- B. Fill up based on the lot size procedure
- C. Fill up to the maximum stock level
- D. Fill up to the reorder stock level
Answer: B
NEW QUESTION # 64
......
SAP C_TS422_2021 is a certification exam that validates the skills and knowledge of an individual in the field of SAP S/4HANA Production Planning and Manufacturing. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification is designed for professionals who are involved in the implementation, customization, and support of SAP S/4HANA Production Planning and Manufacturing solutions. C-TS422-2021 exam requires candidates to demonstrate their expertise in various areas such as master data, production planning, material requirements planning, capacity planning, and shop floor control.
Dumps of C-TS422-2021 Cover all the requirements of the Real Exam: https://www.crampdf.com/C-TS422-2021-exam-prep-dumps.html
Correct Practice Tests of C-TS422-2021 Dumps with Practice Exam: https://drive.google.com/open?id=1eEptpGWJ_GvlgNuPT15_mYa5QJGTouE8